Alter Hall renovations continue
By: Erica Lampert ~Staff Writer~ Workers involved with the Alter Hall project had continuously worked through the 2014 fall semester in order to achieve the building’s opening date this coming fall. During the fall, the Physical Plant team finished the concrete frame that began with only one floor being filled and began more work on the exterior frame of the building. The metal frames have recently been put up along with green coverings that were placed over the frames. The green sheets were painted with a black vapor barrier to help keep moisture from entering the building. “The exterior envelope … Continue reading Alter Hall renovations continue
You must be logged in to post a comment.